A14 Consultation Response
Cambridge Cycling Campaign have responded to the A14 consultation pointing out 51 issues that we believe need to be addressed before we could support this proposed scheme. Our full consultation response is available here.
Cambridge Cycling Campaign have responded to the A14 consultation pointing out 51 issues that we believe need to be addressed before we could support this proposed scheme. Our full consultation response is available here.