Blog of the Quarter: The Ranty Highwayman

Image as described adjacent

‘Don’t worry about perfection. If it looks right then it is right to a greater extent and we can make adjustments as we go.’

Speaker at our January AGM and May monthly meeting, transport engineer Mark Philpotts, aka The Ranty Highwayman, has been updating his blog with useful details on how to roll out temporary infrastructure. Rush Job (26 April) takes a look at the processes need to install temporary schemes, while Practical Materials (17 May) covers some of the options available and the risk assessment measures needed for each.