Waterbeach Greenway: an alternative vision

The Greater Cambridge Partnership (GCP) is currently consulting on a revised alignment for the Waterbeach Greenway. The proposals consist of a 5.5 mile route connecting Cambridge North station with Waterbeach. The route was originally proposed to run alongside the railway line, but will now pass through Milton village, offering the opportunity of valuable improvements
Read the rest of this entry »

Read more

Consultation guide: Waterbeach Greenway 2023

Cover of the Waterbeach Greenway consultation brochureName of consultation: GCP Waterbeach Greenway 2023
(shortlink: tinyurl.com/WaterbeachGW)

From:
The Greater Cambridge Partnership (GCP)

Format: Online survey OR download and print the Word document and post to Greater Cambridge Partnership, PO Box 1493, Mandela House, 4 Regent Street, Cambridge CB1 0YR

If you require any of the materials in an alternative format or language,


Read the rest of this entry » Read more

Consultation guide: GCP Waterbeach to Cambridge 2023

Waterbeach brochure

Name of consultation: GCP Waterbeach to Cambridge 2023
(shortlink: tinyurl.com/Waterbeach23)

From: The Greater Cambridge Partnership (GCP)
Time to complete:
15-20 minutes (plus time to read the associated information)
Format: Online survey OR email comments to consultations@greatercambridge.org.uk.

Deadline: midday on Friday 24 March

The GCP is consulting on plans forĀ an off-road busway route from
Read the rest of this entry »

Read more