Skip navigation

You are in:  Home

All photos in/around Cambridge

This listing only shows photos within a square radius of 15 kilometres of the centre of Cambridge.
Go to the national CycleStreets photo listings for photos beyond.


Showing items 701 to 800 from total of 16,954 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
35330Photo #35330"Any Bike Found Chained to these Railings will be removed without notice and disposed of" 2 Hills Road, Encore EstatesCycle parking:
Problem
sheffield_stands marker
35329Photo #35329Narrow sidewalk leads to overflow pedestrians endangering cyclists. Previous to fencing in this area was relatively open car parking (Peugeot) which took some pressure from the sidewalkRoad environment:
Problem
road marker
35328Photo #35328Unsecured overflow college bike parking. Leads to crowded sidewalk. "The school should have space for all the bikes of the students" (Note the empty space behind the wooden fence)Cycle parking:
Problem
sheffield_stands marker
35327Photo #35327Bike Parking on Campus, insufficient spacesCycle parking:
Problem
sheffield_stands marker
35326Photo #35326Bikes parked along Purbeck road, obstructing sidewalk, many badly secured, all avoiding or excluded from on campus bike parkingCycle parking:
Problem
sheffield_stands marker
35325Photo #35325From Purbeck Rd, access to on campus bike parking.Cycle parking:
Problem
sheffield_stands marker
35324Photo #35324See video at http://www.youtube.com/watch?v=YNxv2hY6it8

The entrance to this cycle path is very limited and requires great care when coming onto and off the road. I need to cycle into the middle of the road to be able to take the corner, even at slow speeds. The path is badly potted and always covered in water.
Road environment:
Problem
road marker
35322Photo #35322See video clip at http://youtu.be/nfXNnYM9Sow

Again, breaking "Highway code rule 163".
http://www.direct.gov.uk/en/TravelAndTransport/Highwaycode/DG_070314

As the Highway code picture shows, why isn't the driver all the way over the central line? There's no traffic on the other side, so there's absolutely no reason to be this close. Of course if there was traffic on the otherside you must NOT overtake!
Enforcement:
Event
enforcement marker
35321Photo #35321Cycle parking at the leisure park on a gloomy January day.Cycle parking:
Good practice
sheffield_stands marker
35320Photo #35320Riders emerge from the central cycle lane off Hills Road bridge - away from the dangers of the left turning traffic.Road environment:
Good practice
road marker
35319Photo #35319Lots of bikes cling to the balcony supports in this relatively new development. Clearly the cycle parking that was provided, (see nearby photos or e.g. #35319 and #35317) has been inadequate.

It would have seemed easy in a new development to have anticipated this and provided for it properly. Instead we have a disappointing mess.
Cycle parking:
Problem
sheffield_stands marker
35318Photo #35318The sign on the lamp-post at the left suggests "Steal a bike!" in big letters. Its only if you go up and read the small print that it makes it clear this is some kind of iffy 'dare you' type crime reduction measure.General sign/notice:
Problem
general_sign marker
35317Photo #35317Complicated wall mounted cycle racks in a ground level car park. Why ordinary Sheffield-style cycle parking couldn't be used here is beyond me. If you look carefully you'll notice that one of the racks in the middle of the photo has come away from the wall. It is not clear how the bikes can be locked to the rack or wall. Very poor and inexcusably bad - but on the other hand they are well used. But this is for bike storage rather than cycle parking.Cycle parking:
Problem
sheffield_stands marker
35316Photo #35316Hills Road bridge central cycle lane for straight on cyclists.Cycleway:
Good practice
cycleway marker
35315Photo #35315By counting the blockwork, which are usually 10x20 cm, I estimate these racks on this fairly recent development have been placed at only 50 cm spacing. This is not what is in the planning guidance and means that space is wasted here.Cycle parking:
Problem
sheffield_stands marker
35313Photo #35313Using a modified gaming chair as a recumbent development workstation for CycleStreets.

See also #36851.
Other:
Good practice
white_wisp marker
35312Photo #35312This supermarket was allowed to open on this site without providing any cycle parking. For years the building next door (out of shot to the right, but see #17250) has had NO CYCLE PARKING signs affixed to its railings.

This is another blot on Cambridge city council who repeatedly fail to enforce their own cycle parking standards.
Cycle parking:
Problem
sheffield_stands marker
35306Photo #35306A bicycle clings to a lamppost in a residential street where all the gardens seem to have become car parks.Cycle parking:
Problem
sheffield_stands marker
35305Photo #35305I think I can count about 9 bikes on the upper decks in this housing development.Cycle parking:
Problem
sheffield_stands marker
35290Photo #35290Riding past the long queue of traffic (which stretches round the distant corner most of the length of Jesus lane) for Park Street Car Park.Congestion:
Good practice
congestion marker
35288Photo #35288Cycle parking overflowing at the Fitzwilliam Museum. Its especially busy because its the last few days of the Vermeer's Women exhibition.

The white sign on the A board is washed out by reflection of the sun, but it reports that 'Cycle thieves operate in this area'.

Loads of big baskets.

http://www.fitzmuseum.cam.ac.uk/
Cycle parking:
Good practice
sheffield_stands marker
35285Photo #35285The Outspoken team pose outside their offices - its a photo-shoot for their new website.

http://www.outspokendelivery.co.uk/about-us/team
Other:
Event
white_wisp marker
35282Photo #35282Provide a suitable way for cyclists to get onto the busway cycle track. The bridleway just to the North is a death trap with a base of loose cinders intermixed with sharp wires and other rubbish, designed to give punctures.Obstruction:
Problem
obstruction marker
35262Photo #35262The surface here is OK for small wheelers like this Brompton, but gets slippy and rougher further along.Cycleway:
Infrastructure
cycleway marker
35261Photo #35261Although the sign says footpath it seems to have been upgraded to a bridleway, see #35260.Cycleway:
Infrastructure
cycleway marker
35260Photo #35260This farm track now seems to have been upgraded to a bridleway according to the notices pinned on the post, but not according to the visible signage in the area.Cycleway:
Infrastructure
cycleway marker
35259Photo #35259Overtaking a bit too close to the parked car, but mindful of the on-coming traffic.Road environment:
Event
road marker
35258Photo #35258Safe and comfortable overtaking distance.Road environment:
Event
road marker
35257Photo #35257Cycleway gives way to farm access road.Cycleway:
Infrastructure
cycleway marker
35256Photo #35256Cycleway crosses road.Cycleway:
Infrastructure
cycleway marker
35255Photo #35255Sawston end of the cycleway from Babraham.Cycleway:
Good practice
cycleway marker
35254Photo #35254Sawston end of the cycleway from Babraham.Cycleway:
Good practice
cycleway marker
35253Photo #35253Sorry about the picture quality but it was cold, wet and getting dark. At least it gives a flavour of the cycle path here.Cycleway:
Infrastructure
cycleway marker
35252Photo #35252Its getting dark, but these white dashes help to see the edge of the cycleway.Cycleway:
Good practice
cycleway marker
35251Photo #35251The worst kind of cycle parking, concrete wheel benders, two of which have been 'upgraded' with a wall anchor point. Grim.

This is outside a nursery school.
Cycle parking:
Problem
sheffield_stands marker
35250Photo #35250Rather unusual one-way system in a residential area - but then again this is a private development.Road environment:
Infrastructure
road marker
35249Photo #35249Babraham - the 'footpath' sign is the route to Abington, 1½ miles away.Road environment:
Infrastructure
road marker
35248Photo #35248Covered cycle parking at a school.Cycle parking:
Good practice
sheffield_stands marker
35247Photo #35247BabrahamRoad environment:
Infrastructure
road marker
35246Photo #35246What a shame that a cyclist by pass was not created in this build-out.Road environment:
Problem
road marker
35245Photo #35245A bike ride between Cambridge and Babraham.Road environment:
Infrastructure
road marker
35244Photo #35244A bike ride between Cambridge and Babraham.

New cycleway between Sawston and Babraham.
Cycleway:
Good practice
cycleway marker
35243Photo #35243A bike ride between Cambridge and Babraham.

View of the Babraham Insititute.
Destination:
Good practice
destination marker
35242Photo #35242A bike ride between Cambridge and Babraham.
This path is a bit rough and not suitable for small wheeled bikes.
Cycleway:
Infrastructure
cycleway marker
35241Photo #35241A bike ride between Cambridge and Babraham.

This gate and narrow gap next to it would be hard to see at night.

This path is a bit rough and not suitable for small wheeled bikes.
Obstruction:
Problem
obstruction marker
35240Photo #35240A bike ride between Cambridge and Babraham.

This path is a bit rough and not suitable for small wheeled bikes.
Cycleway:
Infrastructure
cycleway marker
35239Photo #35239A bike ride between Cambridge and Babraham.

Sign from Babraham Farms making it clear that this track off the bridleway is not for horses or bikes.
General sign/notice:
Infrastructure
general_sign marker
35238Photo #35238A bike ride between Cambridge and Babraham.

A horse mounting block on the bridleway.

This path is a bit rough and not suitable for small wheeled bikes.
Cycleway:
Infrastructure
cycleway marker
35237Photo #35237A bike ride between Cambridge and Babraham.Cycleway:
Good practice
cycleway marker
35236Photo #35236A bike ride between Cambridge and Babraham.

This horse mounting block is the first hard evidence we've seen that this is a bridleway (and hence legitimately cyclable).
Cycleway:
Good practice
cycleway marker
35235Photo #35235A bike ride between Cambridge and Babraham.

Returning to pick up a dropped glove.
Cycleway:
Infrastructure
cycleway marker
35234Photo #35234A bike ride between Cambridge and Babraham.

Hard to know whether this bit of the footpath has recently been upgraded to bridleway status - its so narrow that it doesn't feel like it.
Cycleway:
Infrastructure
cycleway marker
35232Photo #35232A bike ride between Cambridge and Babraham.

Track was a bit narrow and slippy for the small wheels of a Brompton here.
Road environment:
Infrastructure
road marker
35231Photo #35231A bike ride between Cambridge and Babraham.Road environment:
Infrastructure
road marker
35230Photo #35230A bike ride between Cambridge and Babraham.Road environment:
Infrastructure
road marker
35229Photo #35229A bike ride between Cambridge and Babraham.

http://www.cyclestreets.net/journey/1429329/
Road environment:
Infrastructure
road marker
35228Photo #35228Showing a repainted section of the colourful 10,000th mile. See #10000Cycleway:
Good practice
cycleway marker
35227Photo #35227This seems to be the cycleway towards Addenbrooke's. The no-entry sign is presumably for the yet-to-be-built road on the left.Cycleway:
Infrastructure
cycleway marker
35226Photo #35226Mixed message: "Get off the pavement, except when its convenient for traffic management purposes."

#35225 shows the other side of this sign, which invites riders onto the pavement.
General sign/notice:
Problem
general_sign marker
35225Photo #35225Right turning riders are asked to turn left on to the pavement and use the pedestrian crossing, but a full advanced stop line is provided.
The ahead only arrow on the traffic lights has a bus exception. It seems that all this amounts to a 'no right turn' for cyclists here - but it is certainly ambiguous.
General sign/notice:
Infrastructure
general_sign marker
35220Photo #35220Mickey Flynns American Pool, Mill Road, CambridgeDestination:
Misc
destination marker
35208Photo #35208St Andrews Street clear of all traffic.Road environment:
Event
road marker
35207Photo #35207St Andrews Street clear of all traffic.Road environment:
Event
road marker
35193Photo #35193Cambridge Cycling Campaign stall at the Mill Road Winter FairBicycle:
Event
bike marker
35192Photo #35192Barriers temporarily opened here during the Mill Road Winter Fair.

For the rest of the year, whilst a barrier is needed to stop through-traffic, this photo shows how much easier cycling through here would be if the gate were replaced with a central bollard.
Obstruction:
Problem
obstruction marker
35178Photo #35178Overflow parking at Grand Arcade cycle park. Every available bit of wall space take up with bikes. No signs warning cyclists not to do this, so it is seemingly tolerated. (Shh!)Cycle parking:
Problem
sheffield_stands marker
35149Photo #35149Only in Cambridge?

A gold coloured frame politely states the case for the privacy of this drainpipe. For more context see #35148.

66
on y' bike
A message to our kind, thoughtful and considerate customers.
Please do not under any circumstances attach yourself or your bicycle to this privately owned drainpipe.

Have a care.
99

Perhaps the restaurant,

http://www.back-street.co.uk/

would like to say what accommodation they make for customers arriving by bike? There do not seem to be any cycle parking stands in the vicinity.
General sign/notice:
Problem
general_sign marker
35148Photo #35148Bikes parked in Sturton Street, but the drainpipe has a funny sign, detailed in #35149.Road environment:
Infrastructure
road marker
35147Photo #35147A useful cut-through and generous chicane.Obstruction:
Good practice
obstruction marker
35144Photo #35144Second page of newsletter - page 1 at #35143Enforcement:
Problem
enforcement marker
35143Photo #35143This newsletter from Romsey Lib Dems seems to suggest that Tesco have admitted to delivering from the front of the store on Mill Road, which is against the planning consent for the store.Enforcement:
Problem
enforcement marker
35133Photo #35133Beta version of Cyclescape being shared with a stakeholder group.Other:
Event
white_wisp marker
35132Photo #35132Martin demonstrates the Cyclescape system to a stakeholder group.Other:
Event
white_wisp marker
35131Photo #35131Lots of bikes parked against this bank.Cycle parking:
Infrastructure
sheffield_stands marker
35113Photo #35113Bicycle rails are currently in the process of being modifiedObstruction:
Problem
obstruction marker
35112Photo #35112Bicycle rails are currently in the process of being modifiedObstruction:
Problem
obstruction marker
35111Photo #35111Bicycle rails are currently in the process of being modified. See also #35864 and #35861.Obstruction:
Problem
obstruction marker
35109Photo #35109Bicycle rails are currently in the process of being modifiedObstruction:
Problem
obstruction marker
35108Photo #35108Bicycle rails are currently in the process of being modifiedObstruction:
Problem
obstruction marker
35107Photo #35107Members of Cambridge Cycling Campaign enjoying a Seasonal Social, December 2011Other:
Event
white_wisp marker
35106Photo #35106Leaving a 20 mph zone, and enterring another one!General sign/notice:
Problem
general_sign marker
35105Photo #35105Christ on a bike will be paid - 20p a mile.General sign/notice:
Good practice
general_sign marker
35103Photo #35103Wherever there is space, cars will squeeze in - often blocking each other in. Traffic wardens will not ticket a vehicle unless it completely obstructs the footpath or is on double yellow lines. As these vehicles are not on the "Road" they are not in the wrong.Car parking:
Problem
car_parking marker
35102Photo #35102Builders from the nearby Brunswick Development (http://www.brunswick-site.co.uk) use the cycle path under the bridge for free parking, obstructing the foot path.Car parking:
Problem
car_parking marker
35101Photo #35101Builders from the nearby Brunswick Development (http://www.brunswick-site.co.uk) use the cycle path under the bridge for free parking, obstructing the foot path.Car parking:
Problem
car_parking marker
35100Photo #35100By crossing the bollards at Cutter Ferry Close, cars and vans can park all along the cycleway both sides of the bridge.Car parking:
Problem
car_parking marker
35099Photo #35099Excellently located cycle parking - right outside the front door of this apartment hotel.Cycle parking:
Good practice
sheffield_stands marker
35072Photo #35072Cycle parking at the Klub Polonia restaurant.Cycle parking:
Problem
sheffield_stands marker
35069Photo #35069We've had reports that on the weekends in the run-up to Christmas this area is totally swamped with vehicles trying to avoid city centre car parking charges.Car parking:
Problem
car_parking marker
35068Photo #35068Unusual cycle route in which the cycleway is on the raised section.Cycleway:
Infrastructure
cycleway marker
35067Photo #35067Bicycles not at all catered for in this housing development which dates (I guess) from the 1980s. Unfriendly NO CYCLES signs also scatter the development further eroding the happiness of this unwelcoming site.Cycle parking:
Problem
sheffield_stands marker
35066Photo #35066Dismal failed cycle parking crammed in as a rubbishy after-thought onto the narrow space in front of parked cars.Cycle parking:
Problem
sheffield_stands marker
35032Photo #35032This photo shows the channel that has been added to the station footbridge (which is still under construction).

Rather than a channel, it seems to be just an angle girder, and is directly underneath the handrail, as shown in #35031. It looks like it will be very awkward to use, requiring the bike to be pitched at a steep angle.

How disappointing, when there are so many other examples available of how to do this right, such as some of the examples at:

http://www.cyclestreets.net/photomap/tags/channel/
Obstruction:
Problem
obstruction marker
35031Photo #35031This photo shows the footbridge at Cambridge Railway Station, which is still under construction. See also #35032.Other:
Problem
white_wisp marker
35006Photo #35006Dr Bike event organised by CUSU and County CouncilBicycle:
Good practice
bike marker
35005Photo #35005Dr Bike event organised by CUSU and County CouncilBicycle:
Good practice
bike marker
34997Photo #34997The hedgerows have been chopped back, but the thorns left on the cyclepath managed to puncture Schwalbe Marathon ('puncture proof') tyres... I know that clippings aren't normally dalt with, but this is the second time on the same stretch that this has happened, so it'd be nice if these particularly vicious spikes could be moved to one side after clipping (yeah, I know...).

Thanks.
Obstruction:
Problem
obstruction marker
34995Photo #34995Covered cycle parking immediately outside a medical centre.Cycle parking:
Good practice
sheffield_stands marker
34994Photo #34994This doesn’t show the full extent of it, but bikes were parked on every available immovable object on Saturday at the Mill Road Winter Fair.Cycle parking:
Event
sheffield_stands marker
34993Photo #34993Mill Road closed for the winter fair 2011

http://www.millroadwinterfair.org/
Other:
Event
white_wisp marker

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *





Your comments: *
URL of page: * http://www.camcycle.org.uk/map/photos/all/page8.html
How did you find out about CycleStreets?:
Your name:
Our ref:

* Items marked with an asterisk [*] are required fields and must be fully completed.