You are in: Home » Mapping and photo-maps » Photomap
Online mapping: Nearby photos
Photo Number #9351
The scene greeting visitors to Cambridge on their way from the railway station. An acute lack of secure cycle parking leads to bikes parked insecurely to the wooden railing, with the result of this vandalism.
The comments and images here are not necessarily the policy view of the Campaign but reflect the views of the original submitter.
Photos Nearby
This list of photos is ordered by nearest first. See also earlier and later photos.
The scene greeting visitors to Cambridge on their way from the railway station. An acute lack of secure cycle parking leads to bikes parked insecurely to the wooden railing, with the result of this vandalism.
0 metres
People resort to desperate lengths at the station to park their bike securely, because of the shortage of spaces.
2 metres
Vegetation growing up through the cycle parking on the right but also on the central rack on the left (look into the distance).
35 metres
Stupidly-located bus shelter, with barely enough room for a single pedestrian to pass, even if the inconsiderately parked bikes (parked informally due to shortage of official spaces) weren't there.
35 metres
Cyclists at Cambridge railway station have to put up with lack of spaces, an inadequate surface, and weeds growing up between the bikes.
45 metres
Cambridge Station car park. This sign shows why the station owners have been so uninterested in providing desperately-needed new cycle parking: because each car parking space (including entry manoeuvring space - equivalent to 10-20 cycles p ... [more]
49 metres
Cambridge station, 1.10 on Strawberry Fair afternoon - hordes of people passing through police checks to the left, but thankfully bikes, dogs, buggies etc are brought out by a separate channel (and are even spared a ticket check).
51 metres
Signs added in August 2006 at the railway station. (Click on 'original' to see at a readable higher resolution.)
54 metres
Straight on to: Newnham 1 1/2 Addenbrooke's 1 3/4 Trumpington 2 1/2 West Cambridge 2 3/4 Turn right to: City Centre 1 1/2 Abbey 2 1/3 Cherry Hingon 2 1/2 Chesterton 3 Arbury 3 1/4 Kings Hedges 4 Pedestrian route to City Cent ... [more]
54 metres
The clock that stood on a tall post on this island is a distant memory. This photo shows the detailed pedestrian and cycleway signage with distance information.
68 metres
Nigel Deakin (second from left) and fellow CTC members leaving Cambridge to ride the End-to-End - naturally Nigel has a LeJog-blog.
69 metres
Cycle parking needed at the new Travel Centre (for advance rail tickets) at Cambridge station.
76 metres


























