You are in: Home » Mapping and photo-maps » Photomap
Online mapping: Nearby photos
Photo Number #12790
Cycle path as seen in #12789 showing the route over the road next to the bridge.
It's still under construction, but we've got proper lights now so that cyclists can see where they are going.
The comments and images here are not necessarily the policy view of the Campaign but reflect the views of the original submitter.
Photos Nearby
This list of photos is ordered by nearest first. See also earlier and later photos.
Cycle path as seen in #12789 showing the route over the road next to the bridge. It's still under construction, but we've got proper lights now so that cyclists can see where they are going.
0 metres
I have now solved the mystery of why this path is narrower than the usual 4 metres and why it had its width written on it. The path was resurfaced a few days after this photo was taken. The width was written on to make sure the contractor d ... [more]
49 metres
"Glass" barriers on this bridge serve to keep traffic noise from the residents of house boats, stop cyclists falling into the water from the bike path and they look nice.
60 metres
Wonderful canal path. Other views are at #11713 and #11784, but this one provides video. The path has the standard width of four metres.
64 metres
Alternative view of new path construction also shown in #12105 The camera shows the direction of the cycle path, which also turns right to cross the bridge. The van is parked parallel with the road that the path crosses at this point and ... [more]
75 metres
New bridge constructed to take a dual carriageway over a cycle path. This huge bridge replaced a very large road junction which was in this position previously. Drivers can no longer leave the dual carriageway at this point and follow wh ... [more]
104 metres
View of the construction of a new lifting bridge on the canal at Groene Dijk in Assen. The existing bike path has been moved towards the camera and a new crossing will be installed to cross the road (in one go and with no obstacles). ... [more]
111 metres
New bike path over a new bridge. The bike path is as wide as one lane of the road. Other views of the bridge can be seen in #12105 and #12106 The video shows how this new path joins with that shown in #11713 and #12302 The bike ... [more]
142 metres
Temporary bike parking stands which previously were deployed in a totally routine manner on a local building site so that workers could use them and now awaiting collection.
165 metres
A temporary cycle bridge over a canal. This is constructed of concrete and steel and has a smooth 3 metre wide surface. If this had not been installed then an important link in the cycle network would have been broken. That very rarely h ... [more]
181 metres
Approaching a cycle path at -5 C on the 22nd of December. Note how the path and the minor road leading to it are clear of ice.
183 metres
A cycle path which provides an alternative for a short distance to that shown in #11713 and goes into a residential area. Because this is merely a link path, it is narrower than usual at just 3.5 m.
186 metres
At this point, minor access roads are linked by short sections of cycle path producing a direct route for bikes but not for cars. While it may look like the junction loses priority for bikes, it does not. The Dutch traffic laws expect both ... [more]
223 metres
Most things to do with bikes are legal in the Netherlands, including cycling with Fido on the bike path. Why should dogs miss out on the fun ? Cycling with two dogs at the same time is considered to be a bit more than the average person ... [more]
267 metres
It's the 20th of December, just after 8 am. It's been below freezing for several days now, but here are a mother and child on the way to school on a cycle path by the canal in Assen. See also #12341
317 metres
This used to be one of the main roads to the centre of the city, but now it's a "bicycle road" and used by cars only for access. Motorists have been given a different (less direct) route. The bike lanes here are 1.5 m each. The car lane ... [more]
344 metres
Old main road being re-worked into a "bicycle road" which gives priority to cyclists. Through motorised traffic is being sent by a different (longer, less direct) route over a new bridge #12105). This will consist of two large red cycle lan ... [more]
367 metres
"Blij dat ik fiets" - "Happy that I cycle" Sticker for the rear mudguard given out by Fietsersbond - the Dutch cycle campaigning organisation. Smiling while cycling is normal here.
465 metres
Sound barriers being installed along a road which is being widened in Assen. The road is being widened from 1 lane each way to 2 lanes each way. Even though the road will have only a 70 km/h speed limit (44 mph), the problem of noise fro ... [more]
471 metres
Xtracycle Free-Radical taking yet another load of baskets to the post office... You can read a review of the bike after 5 year's use (including a video) here: http://hembrow.eu/personal/xtracycle.html
483 metres
The neighbour's nanny with a child on a trike with trailer. Residential roads here are used by children with all sorts of contraptions like this. A few days previously the child sitting in the back was riding the trike and pulling his 9 ... [more]
487 metres
The all important junk mail delivery in Assen, Netherlands. This huge bicycle trailer carries vast amounts of paper and must be very heavy to pull with a bike. Lots of delivery jobs are done with bicycles in this area. The junk mai ... [more]
491 metres


























